khayyatmilad

About Candidate

Location

Education

B
Bsc in material engineering (Industrial Metallurgy) 2007 to 2011
Shahid Chamran Univiersity of Ahwaz
M
Msc in Material Engineering (Material Selection and Characterization) 2011 to 2014
Iran University of Science and Technology

Work & Experience

Q
Quality Inspector, Inspection Coordinator February 1, 2014 - March 1, 2019
Ab Karkhe consultant company

• Inspection During Manufacturing of Khouzestan Steel Company Commodities (Manufacture in Paya Steel Company) • Inspection of commodities of NIDC, NISOC ,… in China and Iran 1. Inspection of Drilling Bits (King Dream, Best bit Company) 2. Inspection of Line Pipe (Synda Corporation, HEBEI LITONGLIANSEAMLESS STEEL Co) 3. Inspection of Casing & Tubing (O1 Drilling Rig, Sepehr No.1 Drilling rig, Wuxi Huayou Special Steel, …) 4. Inspection of wellhead equipment according to API 6A (MSP Drilex, Wetco) 5. Inspection of Casing Accessories (Iran Drillers Co, Nasre Mobtakeran Co, Pars Poolad Aghaei Company, …) 6. Inspection of stainless steel pipes In accordance to ASTM A312, ASTM A999. (Hebei Litonglian Seamless Steel Pipe Co) • Inspection of Water transportation line pipe 60” (1600 m) in accordance to AWWA C200 1.1. Manufacturer: Ahwaz Pipe Mill 1.2. Client: Khuzestan Water and Power Authority • Coating inspector for water transportation line pipe 36” (AWWA C210) 1.3. Manufacturer: Khuzestan Coating Company 1.4. Client: Khuzestan Water and Power Authority • Inspection of Drain Pipes of Jahad Nasr Institute (Khouzestan PVC Co, Aban Bespar Co) • Inspection Project Coordinator (Bucket wheel for Khuzestan Steel Company) Client: Khuzestan Steel Company Manufacturer: NHI company • Inspection of line pipe 22” & 18” (8000 m) in accordance to IPS-M-PI-190 and API 5L 1.1. Manufacturer: Ahwaz Pipe Mill 1.2. Client: Iranian Oil Pipeline and Telecommunication Company • Inspection of line pipe 16” (90000 m) in accordance to IPS-M-PI-190 and API 5L 1.1. Manufacturer: Ahwaz Pipe Mill 1.2. Client: Iranian Oil Pipeline and Telecommunication Company • Inspection of water transition pipe line (28000 m), Fusion Bonded Epoxy coating for outside, Solvent Free Epoxy coating for inside 1.1. Manufacturer: Ahwaz Pipe Mill 1.2. Client: Gachsaran Petrochemical Company • Inspection of manufacturing of polyethylene pipes (domestic standards) • Supervision of PQR mechanical tests (ASME Sec IX, API 1104) • Inspection of raw material (Steel plates, pipes and fitting)

Q
Quality Inspector December 1, 2018 - March 1, 2020
Iran Group of Surveyors

• Inspection of line pipe 42” (1100 k m) in accordance to IPS-M-PI-190 and API 5L 1.1. Project: Gureh-Jask line pipe 1.2. Manufacturer: Ahwaz Pipe Mill, Khuzestan Oxin Steel 1.3. Client: PEDEC (Petroleum Engineering and Development Co.) 1.4. Responsibility: Lab inspector: witness mechanical and chemical tests, witness HIC and SSCC Tests, metallurgical and microstructural tests for pipes, steel plates and FBE coating.

I
Inspection supervisor and consultant March 1, 2020 - April 26, 2024
South Steel Pishgaman

1.5. Project: Construction of Direct Reduction Plant (Zamzam III) 1.6. Client: KSC Responsibilities: - Review of all inspection documents and procedures such as ITP, WPS/PQR, painting procedures and etc. - Attend in PIM meetings as clients representative. - Review inspection reports to assure inspection to be done according to the ITPs. - Give solutions on inspection problems.

Be the first to review “khayyatmilad”

Your Rating for this listing